Project Cargo


25 North Colonnade
Details
Location
London E14
Main Contractor
ISG
Architect
Gensler
Project Outline

25 North Colonnade is a major repositioning scheme in Canary Wharf,  London, that has revitalised a 1990s office building, one of the first  to be built in the Wharf.

Gensler’s design elevates the commercial  office building to new prominence as a destination with convenient  adjacency to the Elizabeth Line station — a major new transport node  to the Wharf that serves over 150,000 people a day. The lower levels  feature an exciting market hall concept which creates a space for all,  supporting multiple uses throughout the daytime and evening. The  publicly accessible market hall provides a variety of F&B offerings, as  well as scheduled events and pop-up attractions. 

Scope of Works 

Stortford Interiors’ (UK) in-house joinery division, Parkrose, was  appointed by ISG to design, deliver and install a full turn-key  washroom solution to the central core throughout the building. The  holistic scope captured a full architectural and MEP remit which  de-risked delivery within the typically congested central core. The  comprehensive turn-key package scope comprised drywall partitions  and ceilings, door sets and ironmongery, laminate faced IPS duct wall  and cabinetry, Corian vanity tops and splashbacks, Domus Wicker  Pullen wall panelling, raised GIFA access floors, porcelain floor and  wall tiling, vinyl flooring, decoration, mirrors and associated fittings  to the building’s washrooms, changing rooms and shower areas. The  scope also extended to shower cubicles, lockers and benching, and  as part of the scheme, Parkrose incorporated a full Mechanical and  Electrical Services installation within the demise.  

The wide architectural remit, variety of intimate product interfaces  and the highest of quality expectations provided Parkrose an  opportunity to excel and demonstrate our class-leading credentials.  Our in-house design team worked in close conjunction with the  project stakeholders to ensure our pre-construction activities de-risked delivery and facilitated an efficient installation.

Length
56 Weeks
Value
Undisclosed